Emergency ROM Bin Repair & Structural Analysis
Client: CS Energy
Completed: 2024
Integrity & Compliance Assessments + Design & Drafting
Scope
The ROM (Run-of-Mine) Bin is an initial and critical asset for fuel collection of the 1x 750MW supercritical power station which was reported to have noticeable damage, requiring structural inspection expertise.
Challenges
Structural assessment identified significant risks; bin was temporarily put out of service to avoid operational failure.
Outcomes
- Urgent engineering solution developed and implemented within 10 days to avoid costly outages.
- ROM Bin was returned to service inside the client’s outage window, avoiding unit derating and penalty exposure.
- Management received a defensible engineering report on actual condition and risk.
- Temporary repair design provided a controlled pathway to final rectification during a planned overhaul.